Clearing Circular 40/2019 | ECC C7 Release 6.0 – Release notes

    As of 18 November 2019, ECC scheduled the C7 Release 6.0 for production and is fully aligned with Eurex Clearing. The simulation phase will start on 16 September 2019.
    Short summary of the planned changes:

    • Porting of user maintenance to C7 GUI
    • Porting of Eurex Classic Product (Group) Assignment to C7
    • Decommissioning of Eurex Classic GUI (@X-tract GUI)
    • Decommissioning of Eurex Classic ‘Transaction Size Limits’
    • Report changes
    • Enhancement of FIXML message

    This circular is the first in a series of announcements regarding the matter of C7 Release 6.0 and shall highlight the areas of change, necessary preparations required from ECC member as well as the overall timeline of this release. Additional information will be distributed shortly after the start of the simulation phase and with sufficient leadtime before production.

    We strongly recommend all ECC members to participate in the simulation in order to test the new functionalities and the reports.